10,000 sq metres Refurbishment

When a major manufacturer of components for the motor industry first felt the effects of the credit crunch a decision was taken to close a large factory on Deeside.  There was only one catch, the unit measuring 10,000 square metres, was to be returned to the landlords in perfect condition but after 8 years of use the floor was showing its age.

Surface Solutions were called in to clean, repair and renovate the whole area.

Firstly we cleaned the floor by dust free enclosed shot blast, then repaired all the damaged areas and bolt holes and rebuilt 500 metres of expansion joints. Lastly an epoxy resin finish was applied.

All this work was carried out within a very tight time frame and so good was the end result that the landlords had no problem in securing a new tenant in very short time.